Convert your total concrete volume in cubic metres into the number of mixer loads. Calculate cement bags, sand and aggregate for each batch and total mixing time.
Total volume of concrete needed
Select your concrete mixer size
How We Calculate This
This calculator converts a total concrete volume (in m³) into the number of individual mixer loads based on your mixer type and its usable output capacity.
Mixer Output Capacities
- Mini Mixer (90L drum): ~60 litres usable output per load
- Half-Bag Mixer (130L drum): ~90 litres usable output per load
- Full-Bag Mixer (180L drum): ~130 litres usable output per load
- Barrow Mix (hand): ~40 litres per batch
Standard C20 Concrete Mix (1:2:4)
The materials are calculated using a standard C20 general purpose mix ratio of 1 part cement to 2 parts sharp sand to 4 parts coarse aggregate (20mm), by volume. Per cubic metre of concrete this requires approximately:
- 6.5 bags of 25 kg cement
- 0.45 m³ of sharp sand (~680 kg)
- 0.9 m³ of 20mm aggregate (~1,350 kg)
Time Estimates
Mixing time per load varies by mixer: mini mixers ~8 minutes, half-bag ~7 minutes, full-bag ~6 minutes, and barrow mixes ~5 minutes. These are mixing-only times — total time per batch including loading, pouring and cleaning will be longer.
Frequently Asked Questions
Related Calculators
Area Calculator
Calculate areas for rectangles, triangles, circles and irregular shapes.
Volume Calculator
Calculate volumes for cubes, cylinders, cones and irregular shapes.
Metres to Feet Converter
Convert between metric and imperial measurements.
Kg to Bags Converter
Convert bulk weights to bag quantities for common building materials.
Cubic Metres to Tonnes Converter
Convert volume to weight for aggregates, sand, soil and more.