Getting the right concrete mix ratio is essential for strength, durability, and suitability for your application. This guide covers the standard mix ratios used in UK construction, from strong structural mixes to lean bedding mixes, with quantities per m³ and guidance on when to use each.

Standard Mix Ratios (Cement : Sand : Aggregate)

Mix RatioStrengthCommon Use
1 : 1.5 : 3Very strong (~35 N/mm²)Structural lintels, pre-cast items, heavy-duty floors
1 : 2 : 3Strong (~30 N/mm²)General structural: foundations, ground beams, reinforced work
1 : 2 : 4Medium/strong (~25 N/mm²)Foundations, oversite, driveways, garage floors
1 : 2.5 : 4Medium (~20 N/mm²)General purpose, paths, light-duty slabs
1 : 3 : 6Lean (~15 N/mm²)Oversite concrete, base for paving, mass fill
1 : 8 (all-in ballast)Weak (~10 N/mm²)Fence post foundations, non-structural bedding

Designated Mixes (BS 8500)

For ready-mix concrete ordered from a batching plant, you'll specify a designated mix under BS 8500. These are standardised mixes designed for specific applications:

DesignationStrength ClassApplication
GEN 0C6/8Blinding, kerb bedding, non-structural fill
GEN 1C8/10Strip foundations (no sulphates), oversite
GEN 2C12/15Domestic foundations (Building Regs minimum)
GEN 3C16/20Driveways, garage floors, external paving
RC 25C20/25Reinforced foundations, suspended floors
RC 30C25/30Reinforced structural work, ground beams
RC 35C28/35Heavy structural, pre-stressed, commercial

GEN 1 / GEN 2 is suitable for most domestic strip foundations. Your structural engineer or building control will specify the required mix.

Quantities Per m³

Approximate quantities of materials needed to produce 1 m³ of mixed concrete:

Mix RatioCement (25 kg bags)Sharp Sand (kg)Gravel/Aggregate (kg)
1 : 2 : 314 bags (350 kg)700 kg1,050 kg
1 : 2 : 411 bags (275 kg)550 kg1,100 kg
1 : 2.5 : 410 bags (250 kg)625 kg1,000 kg
1 : 3 : 68 bags (200 kg)600 kg1,200 kg

Quantities are approximate due to moisture content and compaction. Always order 5–10% extra.

Site-Mixed vs Ready-Mix

For volumes over 1 m³, ready-mix from a batching plant is almost always more practical and ensures consistent quality. Minimum order is typically 1 m³ (some suppliers offer 0.5 m³ in a mini-mix truck). Ready-mix costs around £80–£120 per m³ delivered, depending on location and mix specification.

For smaller volumes, site mixing with a cement mixer, bags of cement, and loose aggregates is more cost-effective. One bag of cement (25 kg) makes approximately 0.07–0.08 m³ of concrete in a 1:2:4 mix.

Calculate Your Concrete Needs